August 31, 2010

End of August

Gate fittings have been attached.
Thanks to the work experience boys
from the local high school!

Fill from the leftover mounds
from clearing for the Medical Centre
has been moved to the pathways for spreading.

With some help from an excavator
more pathways were cleared.

The northern fence line where the mesh has been flattened
and rocks added.

Inside the western fence
the windbreak continues to grow
now protected with the rabbit proof mesh
on the re-wired fence.

The Old Man Saltbush in the windbreak planting
is fast outgrowing it’s protective covers.